Previous
Next
Table of Contents
... (explain about the stripping, the .mst, .dst and .cal files, about .gz).
The following steps have to be followed to process one LGD calibration group:
- select a calibration group (and the corresponding range of runs that will be calibrated)
- determine which tapes contain the data to be stripped,
- strip the data off the tapes,
- process the monitoring information,
- run the calibrator
- tar the stripped data to 8mm tape
- check the results
The rest of the document talks about each step in more detail.
Previous
Next
Table of Contents