Trigger Timing Relative to S2

Triggertiming relative to the the time of the beam crossing S2. The 1994 times are taken from notebooks 2 and 3 of the 1994 data run. See notebook 3 for the 1995 times.

The zero time is defined as the time of the beam crossing the beam counter S2. The cable from S2 to the patch panel is RG62 (93 ohm), 24 feet long. This produces a delay of 29 ns. The transit time in the photomultiplier is estimated to be 30 ns, therefore, patch panel time = 60 ns in this system.

The S2 patch panel is in rack 4; the discriminator is located at 8-1-7-4 (rack-crate-unit-subunit) 18 ns away. The discriminator output is at 85 ns.

signal			time (ns)			
			5/3/94 data	1/8/95		2/4/95
			7/12/94	
beam crosses S2		0		0
S2 at FT rack 4 panel	60		60
S2 out of disc(8-1-7-4)	---		85
pretrigger at panel	240
pretrigger fanout	280		280		280
upstream beam pretrig
   at pretrig fanout	---		280
beam pwc input to 
   to stobe fanout	300		300		295/300
    at pwc A4 input	325
tpx1 gate		470		470		460
tpx2 gate		477		476		460
tpx3 gate		493		496		470
TCYL>0 pulse		585-715
TCYL=1 pulse		605-720		614-680-764
delta_t level		680
strobe TPX mlu          690		695 		730
CPVB pulse		770		775 w60	    
CPVC pulse		770		770 w60	   
DEA pulse		770		775
S0 pulse		770
strobe level_1		790		790		800
clockstop at MDM	825 		825		825
strobe 4508 prescale
  outpt of 429 7-1-11-2	890		890		920
level_1 out at spy	855
lev_1 429 out 7-3-9	940		940		950
lev_1 disc out 7-3-12-1	980		980		1000
beam.dt disc output	245

level_2 strobe		10 us
tdc stop		11.78 us

1995 level_2 
The level 2 timing is derived from the LGD mam done signal which comes at varying
times depending on the complexity of the LGD data -- typically between 8 and 16
micoseconds after beam crosses S2.

mam done disc out (8-1-7-1)             define as t=0

mam done to lev_2 4508 clear 7-5-12-2	30 ns
mam done strobe to lev_2 mlu's 7-4-7	35
mam_dly_150 out 7-5-2-3			210
lev_2A/B charged OR output 8-1-7-1	250
lev_2A/B trigs to 4616 7-5-3		250 (w100)
lev_2A/B strecher out			275 (w400)
lev_2A/B 4508 strb (mam dly 150)7-4-21	280 (w100)
mam_dly_300 out (7-5-7-1) 	       	435



//end file