Triggertiming relative to the the time of the beam crossing S2. These times are taken from notebooks 2 and 3 of the 1994 data run.
The zero time is defined as the time of the beam crossing the beam counter S2. The cable from S2 to the patch panel is RG62 (93 ohm), 24 feet long. This produces a delay of 29 ns. The transit time in the photomultiplier is estimated to be 30 ns, therefore, patch panel time = 60 ns in this system.
The S2 patch panel is in rack 4; the discriminator is located at 8-1-7-4 (rack-crate-unit-subunit) 16 ns away.
signal time (ns) 5/3/94 data beam crosses S2 0 S2 at FT rack 4 panel 60 pretrigger at panel 240 pretrigger fanout 280 beam pwc input to to stobe fanout 300 at pwc A4 input 325 strobe TPX mlu (4616) 690 strobe level_1 790 clockstop at MDM 825 (760?) strobe 4508 prescale 890 level_1 out at spy 855 level_1 429 output 940 level_1 disc output 980 beam.dt disc output 245 tpx1 gate 470 tpx2 gate 477 tpx3 gate 493 level_2 strobe 10 us tdc stop 11.78 us
//end file